The concrete floors are being laid over the top of the water/gas/electric pipes and cables so they are all hidden away. This floor level will eventually need to come up more. There is insulation to go on top and then a screed. Mark wishes the water pipes were on top I think, within the insulation, but it is too late now.
Barrusclet -
French farmhouse to rent in the Midi-Pyrenees
No comments:
Post a Comment